When faced with a critical failure at an AD plant, many would have turned away—but not Ross Mingotti. New to the industry, Ross and his team confronted significant challenges, including a failed mixing system, tank complications, and delayed replacement parts, all of which threatened the plant’s operations and revenue. Yet, instead of giving up, they embarked on a journey of innovation, resilience, and partnership that would ultimately revive the plant and secure its future.
This is the story of how a strategic mixing system upgrade, paired with expert support from the manufacturer, transformed a struggling biogas facility into a success story.
From makeshift solutions to cutting-edge overhaul, this case history illustrates how the right choices—backed by trusted, hands-on expertise—can turn adversity into triumph. Dive into this remarkable journey of perseverance and engineering excellence.
Landia Press Release/Case Study:
How a mixing system upgrade and expert backup support from the manufacturer achieved a remarkable AD plant revival
New to the AD/Biogas industry, Ross Mingotti could have been forgiven for walking away from a plant that had already had major mixing issues in its final storage tank. Within two months of his joining the business in December 2021, one of the paddle mixers in the secondary tank failed.
The mixers had worked well since being commissioned in 2017 at AMPGREEN ESTATES’ Greengill Farm AD Plant (near Penrith, Cumbria, in the far north of England), but now came the problem of replacement, and before that – retrieving them. This wasn’t possible without emptying the tank; in this case from the final storage tank. A large tank holding close to 3 million gallons of digestate.
“The final storage tank had already been offline for 12 months,”
said Ross.
“But at least we were still able to run our primary digester, which is the outer ring of the site’s tank-within-a-tank design.”
Jamie Seggie, appointed as AD Plant Manager in February 2022, must have also wondered what he’d walked into – and then to make matters even worse, the invasion of Ukraine shortly afterwards created a delay in the replacement mixers that had been ordered. As the 2.4MwH plant, supplying power to the grid was a considerable problem due to downtime and loss of income.
“After a three-month wait for the mixers, with still no word on the delivery of new parts,” added Ross, we decided to look elsewhere.
Our final storage tank had become very crusted over, but we managed to get it moving temporarily with a very basic propeller mixer that we could mount on the back of a tractor. We went to ADBA’s World Biogas Expo in Birmingham, where we looked hard at some new mixing systems to see what might suit us.
“Potential suppliers then came to visit, and could immediately see that this was a site in distress, but whilst price always comes into it, Jamie and I knew we needed to feel comfortable with whom we were going to work with, and not be taken advantage of with all sorts of add-on sales.
We may have been new to the AD industry, but we were learning fast. It was clear that there hadn’t been much focus on preventative maintenance, but then the original design, with these paddle mixers trapped inside the tanks, made servicing, repair or replacement very time-consuming and costly.
Nobody in the business wants to empty the tank. You can’t just then switch it back on and be back to where the plant should be. It takes around 20 to 40 days, and even then, the gas isn’t at its best quality.”
Jamie Seggie, Plant Manager, at Greengill Farm AD Plant, added:
“We soon saw large increases in hydrogen sulphide, and unwanted spikes in gas quality, so you’re then having to focus less on the actual digesters and more on protecting the engines.”
There’s also the knock-on effects of having to do more oil changes. Parts were wearing much quicker on downstream equipment. With a thermophilic system, there are also significant fuel and boiler costs in heating the tank to bring it up to and keep it above 50 degrees C.”
‘We needed a reliable mixing system that could be looked after, a major disruption to the process’
“Ross and I knew that moving forward, we needed a reliable mixing system that could be looked after, without such major disruption to the process, and a company that would support us. The challenge facing us and our new supplier was the sheer size and volume of our final storage tank (with tanks partially buried underground), and how to get it mixing properly.”
After very careful consideration, Ross and Jamie went ahead with mixers from Landia.
“We knew Landia had a proven track record, and importantly, that they had people on the ground and spare parts readily available in the UK, so we could get the local support that we needed.
It was clear from the outset that they were totally committed to what we were trying to achieve, and importantly for us, everything was flexible.
They were open, honest, and listened; not trying to sell themselves as process engineers, but wanting everything to work, understanding that everything is connected; unlike some that just want to come in and say ‘yes, that’s the one bit that we’re responsible for,’ and not seem to care about whether they’ve actually delivered a solution.
Likewise, we weren’t oversold to. For example, with the electrics – Landia said they could do it, but that it wasn’t their bread and butter, so if we had a trusted local supplier, then that would be fine.
‘Create several mixing patterns within the tank’
“Again, some suppliers might have tried to sell us as many mixers as possible, but starting with our inner annulus tank (our second digester), Paul Broadhurst at Landia came back with a design of four 22kW submersible mixers.
And slightly later, for our final storage (46m by 8m) tank, a total of six mixers (four 11kW, two 22kW), positioned at different heights and running at different speeds and times to create several mixing patterns within the tank, to achieve the desired effect.
Now, with the Landia mixers, both of these tanks get mixed properly, but with minimal power consumption.”
From the Penrith site’s 2500 acres, maize, grass silage and sometimes rye or wheat are utilised as feedstock, feeding in at around 104 tons per day, with approximately 8% total solids for the second digester (30m diameter by 8m height) and around 5% total solids for the final storage tank, from which most of the gas is pulled to run the CHP engines.
In Ross and Jamie’s steep learning curve, they’ve understood that whilst a higher dry solids content means more gas, it can also lead to a point when the tank can’t be mixed.
To further help the consistency of the tank’s contents, AmpGreen is now ensuring that across the estate, all crops/feedstock are chopped to no more than 5mm, so that everything breaks down properly in the AD process.
After using around 15% of the power generated for its own needs at the AD plant, an impressive 85% is sent straight to the grid.
Landia: ‘Always prepared to help’
Ross Mingotti added:
“About six months after we’d tried to order the parts from our original supplier, we were finally told that they were ready! – but of course, out of necessity, we’d long since moved on – to a key position now that with preventative maintenance and known factors, we can control our costs.”
We now have a maintenance contract with Landia for them to service the mixers every six months.
Once again, they didn’t pressurise us to take this on or insist it was part of some inflexible deal.
They offered to work with and train our own maintenance people, but I have to say that the Landia guys who come here are fantastic. They obviously take a lot of pride in what they do and want their customers to be happy.
“We can’t deny that during the switchover to the new mixers, it has been fairly complicated and stressful at times (!), but the Landia install team really shone.”
Things have a habit of changing during a project, but Paul Broadhurst (Landia) and ourselves were always in contact, working together to find the very best solutions, living with the job as it developed – and we still have the peace of mind now, knowing that they care, and will always be prepared to help.”