Solving Food Waste Anaerobic Digestion Plant Pipe Blockage Problems

Spread the love

In this article, we explain a highly effective way to solve food waste digestion plant pipe blockage problems, by using specialist pumps that are highly efficient in conveying “difficult to pump” fluids.

Pipe Blockages – An Increasing Problem for Food Waste Biogas Plants

The topic of how to prevent food waste anaerobic digestion plant pipe blockages is a recurring problem for some plant operators. However, it can be readily solved by the choice of suitable pumps designed for pumping mixed feedstock slurries.

In fact, the subject came up as long ago as 2014 at the RWM Exhibition in Birmingham, while I was talking to anaerobic digestion and biogas plant service providers on their exhibition stands.

A recurring topic that came up was the significant number of UK biogas plants that have been afflicted by pipe blockages.

Back in 2014, when this article appeared in its original form, there were many cases resulting in long plant outages and very substantial lost biogas production.

Biogas pipework systems in which substrate flow has become blocked may have to be dismantled to physically clean them. That can be difficult unless process design pipe layouts, and pumps, are designed for this to be done. Watch our video below in which we took this to heart, just like Verder Pumps did many years ago!

The Short Video below explains the consequences when a Biogas Plant Stops Working:

(Please try not to get too emotional while watching!!)

 

It seems that it has been at those biogas plants which digest solely food waste, or those where the operators have added food waste to their substrate, that this problem has been most acute.

What was also surprising to hear was that;

“expert AD consultants have been slow to appreciate the greater demands on pumping systems which the addition of food waste as a substrate imposes.”

Another opinion is that the fierce competition to win design and build contracts in the AD industry has significantly reduced construction budgets.

2014 UK Government-led Push Toward Reducing Food Waste Raised the Number of Food Waste Pump Blockage Incidents

The recent UK government-led push toward reducing food waste, and digesting what remains, rather than sending it to landfills resulted in a lot of additional biogas plants accepting this type of waste in 2014.

Anaerobic digestion plant pipe blockage problems began to occur soon after plant commissioning at some locations. The problem remains to this day unless suitable pumps are used.

The result of these pump clogging incidents has been some very highly stressed UK biogas plant operators!

Food waste varies enormously in viscosity, and in the UK tends to arrive at AD Plants with a lot more packaging still present, or so it seems, than has been the experience previously elsewhere in Europe.

So, it is not only UK-based experts that have been caught out! There are two main problems which have been causing blockages. These are foreign matter, and the high viscosity of much food waste.

Imperfect De-packaging Contributes to Digestion Plant Pipe Blockage

Image text: "Solving AD plant pipe blockage problems".Most de-packaging equipment isn't totally successful in removing all foreign matter, and this, particularly if fibrous in nature, may build up on pumps, reducing efficiency, and leading to blockages.

Centrifugal/impeller-type pumps are sensitive to the viscosity of the liquid being pumped, and their efficiency tails off when viscosity rises, so the solution has often been to replace these with positive replacement pumps. Positive replacement pumps can also pump solids within certain sizes.

Biogas plant operators have naturally been reluctant to pay for specialist pumps due to their greater cost, nevertheless, the cost of plant outages can be huge.

Knock-on Effects of Anaerobic Digestion Plant Pipe Blockage

Digestion plant pipe blockage is especially damaging when Anaerobic Digestion Plant operators are unable to process their waste feedstocks for a period and may need to tell their suppliers that they are unable to accept more deliveries.

The value of the power produced from biogas plants to the electricity grid operators is also dependent upon high plant operational availability.

So, this is always an important consideration, beyond simple equipment capital cost considerations.

There are several types of positive replacement pumps on the market, but suppliers inform me that the ones being used most often nowadays for these plants in the AD industry are peristaltic pumps designed for pumping solids and slurries.

Food Waste AD Pipe Blockage Prevention Case Study

Verderflex peristaltic pumps were installed at a prestigious brewery, based in Norfolk.

This brewer produces fine-quality real ales, which result in organic residues which are treated in their anaerobic digestion (AD) facility, where they produce biogas to be fed into the national gas grid.

The anaerobic digestion facility is also fed with kerbside-collected food waste, food processing waste, and supermarket food waste in addition to their own brewery waste.

During the process, the substrate enters a feed inlet at the start, where a rotor chopper pump breaks down the raw material, after which it is stored in a holding tank.

Verderflex peristaltic pumps transport the chopped slurry from holding tanks and through a heat exchanger to raise the substrate's temperature to a level suitable for efficient digestion prior to its entering the main AD plant digester tanks.

As this hot organic matter enters the main AD facility, it is dosed accurately at a pre-set rate, by a Verderflex Dura Pump with a pH buffer solution to accelerate and maximize the breakdown of the material.

Maximising the Surface Area of Microorganisms Available as Food for Higher Biogas Yield

The large mass of organic material is ‘churned or recirculated by Verderflex pumps located in a plant room connected through a series of pipes into the digester tanks. This maximises the surface area of the incoming material available for use as food by the bacteria and thereby accelerates the AD process.

In fact, this is described as being instrumental in raising the yield of heat and biogas from this plant.

After completion of the AD process, the digestate and wastewater are pumped from the tank by another Verderflex peristaltic pump for further use as fertilizer.


FAQs: Solving Food Waste Anaerobic Digestion Plant Pipe Blockage Problems

What causes pipe blockages in food waste AD plants?

Pipe blockages are often caused by the high viscosity of the feed slurry, especially of food waste, and the presence of foreign materials. Using inadequate pumps can exacerbate the issue.

How can anaerobic digestion plant pipe blockages be prevented?

The use of specialized pumps designed for mixed feedstock slurries, such as peristaltic pumps, can effectively prevent blockages.

What are the consequences of pipe blockages?

Blockages can cause significant operational disruptions, leading to lost biogas production and financial losses.

What advancements have been made to tackle this issue?

Innovations in pump technology, like the development of peristaltic pumps, have been key in addressing the digestion plant pipe blockage issues in AD plants processing food waste.

[This article was originally published in September 2014. Updated: May 2021. FAQs added April 2024.]

Tags: , , ,
Previous Post
Cenergy solutions - Examples of vehicles powered by ANG technology.
Biofuels General

Cenergy Adsorbed Natural Biogas Cylinders (ANG) Set to Revolutionize Portability of Sustainable Methane

Next Post
Image with text: "Carbon Capture Technology for Food Grade CO2 from Biogas."
Biogenic CO2

Carbon Capture Technology for Food Grade CO2 from Biogas: A Proven New Income Source?

Comments

    • Therese Vostrum
    • April 17, 2024
    Reply

    Food waste biogas plants plagued by blockages since 2014! Simple pump solution exists, but is it widely adopted?

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Home biogas cheat sheet downloads banner ad.
Advertisement Banner for Home Biogas Buddy.
ERTG Claims Service Banner